Content description:
An aerial view of the airport underconstruction, looking northwest toward San Francisco. The new runways are completed, and they too point toward San Francisco. The fluted roof sections are in place over the ticketing building. Th lobby building and control tower are semicomplete, as is the finger structure leading to the plane docks. Most of the rest of the land is being graded. A construction material and supply area is at left center.